Wednesday, February 25, 2009

India's Coalition for Nuclear

According to the Indian government's official view, nuclear power for civil use is well established in India. Its civil nuclear strategy has been directed towards complete independence in the nuclear fuel cycle. This self-sufficiency extends from uranium exploration and mining through fuel fabrication, heavy water production, reactor design and construction, to reprocessing and waste management. The Atomic Energy Establishment was set up at Trombay in 1957 and renamed as Bhaba Atomic Research Centre (BARC) (http://www.barc.ernet.in/) ten years later. The first PHWR, the Rawatbhata-1 that had Canada's Douglas Point reactor as a reference unit, was built as a collaborative venture between Atomic Energy of Canada Ltd (http://www.aecl.ca/site3.aspx) and the Nuclear Power Corporation of India Ltd (NPCIL) (http://www.npcil.nic.in/). It commissioned in 1973 and was duplicated Subsequent indigenous PHWR development has been based on these units. The Rawatbhata-2 that commissioned in 1981 was also built by Canada. The NPCIL is responsible for design, construction, commissioning and operation of thermal nuclear power plants. The ten 220 MWe PHWRs (202 MWe each) were indigenously designed and constructed by NPCIL, based on Canadian design.

Table 3: INDIA'S NUCLEAR REACTORS - CURRENTLY OPERATING

Today 3,360 megawatts of India's electricity capacity is nuclear.
Source: Nuclear Power Corporation of India


There are 15 nuclear power reactors in operation in India, 13 of which are PHWRs (See Table-3). Since 1969, when India's first nuclear reactor was commissioned for power generation, the total amount of power generation till 2005 is peeked at 3,360 megawatts. Among these PHWRs, the RAPS-1 reactor in Rajasthan has been virtually non-operational since its commissioning in December 1973. In addition, eight nuclear power reactors are currently under construction, five of which are PHWRs (See Table-4). Their total amount of power generation is expected to be 3,920 megawatts. There are 8 reactors to be established in the near future adding another 6,800 megawatts of capacity (See Table-5). Between 2010 and 2020, construction of four 220 megawatt PHWRs, ten 700 megawatt PHWRs, three 500 megawatt FBRs and up to six 1,000 megawatt VVERs is projected, adding about 20,000 megawatts, half from PHWRs. India has achieved maturity in the first stage of this program, construction of PHWRs. The beginning of the second stage of the program has been made with the commencement of construction of a 500 MW Prototype Fast Breeder Reactor (PFBR) at Kalpakkam, Tamil Nadu in 2003. The third stage of the program will be launched after a sizeable base capacity has been built of the second stage reactors.

The two Tarapur 150 megawatt Boiling Water Reactors (BWRs) built by GE on a turnkey contract before the advent of the Nuclear Non-Proliferation Treaty were originally 200 megawatts but were de-rated due to recurrent problems. They have been using imported enriched uranium. However, late in 2004 Russia deferred to the Nuclear Suppliers' Group and declined to supply further uranium for them. Then in March 2006 Russia agreed to resume providing a fuel supply.

No comments:

Post a Comment